TM44 inspection · Case study

TM44 inspection for Lift Specialists Ltd

An on-site TM44 inspection documenting the accessible Samsung split air-conditioning equipment and controls at Lift Specialists Ltd.

Location withheldCommercial workplace
Samsung outdoor air-conditioning units inspected at Lift Specialists Ltd
Accessible outdoor air-conditioning equipment documented during the inspection visit.

Client

Lift Specialists Ltd

Service

TM44 inspection

Property

Commercial workplace

Equipment pictured

Samsung split air conditioning

The requirement

Start with the actual building and system.

Lift Specialists Ltd required a TM44 inspection of the air-conditioning serving its commercial workplace. The visit moved from confirming the premises to recording accessible indoor units, outdoor condenser units and local controls. Site notes and photographic evidence were gathered to support the property-specific assessment and reporting process.

On-site TM44 inspection of the air-conditioning serving the premises
Review of accessible indoor and outdoor equipment
Review of the local handheld control
Photographic record to support the property-specific assessment

What was documented

Evidence from the inspection visit.

These are visually supported project facts—not a claim that the building passed or failed TM44.

01

Wall-mounted Samsung indoor comfort-cooling equipment was documented within the occupied space.

02

Samsung outdoor condenser units were accessible for visual inspection.

03

A local handheld controller was available and shown operating in cooling mode during the visit.

Step by step

How the site inspection unfolded.

The inspection moved from the building context to the installed equipment and controls, creating a clear photographic record of what was accessible on the day.

01

Confirm the premises and begin the inspection record

The visit began by confirming the commercial premises and recording the building exterior. This established the property being assessed before the inspection moved to accessible air-conditioning equipment and controls.

Commercial premises of Lift Specialists Ltd at the start of the TM44 inspection
The premises and building exterior were documented first.
02

Locate and document the indoor equipment

Accessible Samsung wall-mounted indoor units were identified within the occupied workplace. Their location, equipment type and installation context were photographed to create an asset-specific record for the assessment.

Samsung wall-mounted indoor air-conditioning unit documented during the inspection
Accessible indoor equipment was recorded in the areas it served.
03

Inspect the accessible outdoor units

Accessible Samsung outdoor condenser units were visually documented. The assessor recorded the visible equipment, installation arrangement and site conditions without treating appearance alone as proof of performance.

Samsung outdoor condenser units visually inspected at Lift Specialists Ltd
Outdoor equipment and its installation context formed part of the site evidence.
04

Record the available controls

The local Samsung handheld controller was photographed while showing cooling mode. Capturing the available operating mode and setpoint helped document how the system was being controlled at the time of the visit.

Samsung handheld air-conditioning controller recorded in cooling mode
The local controller and visible operating settings were included in the inspection record.

Inspection record

The outcome documented here.

01

The premises, accessible equipment and local controls were documented as part of the site inspection record.

02

The captured evidence was prepared to support the property-specific TM44 assessment and reporting process.